Road and Bridge Projects

Florida Department of Transportation Funded Road and Bridge Projects for Holmes County, Florida

Funding for these projects come from the State of Florida Department of Transportation and has no effect on the taxpayers of Holmes County.

Current Road Projects:

CR 2/2A – COMPLETED

Funded by the Small County Outreach Program (FDOT)    
Project description: Resurfacing from the Walton County line to CR 185, a total of 2.4 miles. Construction to begin in December 2014.

CR 177 – COMPLETED

Funded by the Small County Road Assistance Program (FDOT)
Project description: Widening and resurfacing from SR 79 to the Alabama State line, a total of 13.4 miles. Construction to begin in 2015.

Old Mt Zion RdFunded by the Jackson Spring Sediment Reduction Project through the Florida Department of Environmental Protection.
Project description: Dirt road to be paved from Ponce de Leon Springs Rd for a distance of 1 mile.  – Completed

Future Road Projects:

Anticipated Start Date 2016:

Deacon Road (from CR 173S to Sandpath Road, a total of .826 miles)  $603,681  Currently in process
Project description: Dirt road to be paved.

CR 181 (from Walton Co. line to CR 185, a total of 1.808 miles)
$1,604,049 Currently in process
Project description: Resurfacing.

Thomas Drive (from SR 79 to Washington Co line, a total of 1.981 miles) $647,534 Currently in process
Project description: Widen and resurfacing.

Tobe Retherford Rd (from CR 179 to CR 177A, a total of 5.238 miles)
$3,263,309 Currently in process
Project description: Dirt road to be paved.

 CR 183A (from CR 10A to Walton Co. line, a total of 3.331 miles)
$1,606,308 Currently in process
Project description: Widen/Resurface

Anticipated Start Date 2018:

Bonifay/Chipley Road  (from end of pavement to Washington County line, a total of 4.449 miles).
Project description: Dirt road to be paved.

Bonifay/Gritney Road (from CR 177A to Josey Rd, a total of 3.846 miles).
Project description: Dirt road to be paved.

Bridge Replacement Projects:

Funding for these projects come from the State of Florida Department of Transportation and has no effect on the taxpayers of Holmes County.

Anticipated Start Date 2017:

Jones Loop over Pine Log Creek Bridge #524206
Project description: Replace wooden bridge with concrete

Reddick Mill Road over Unnamed Branch Bridge #524117
Project description: Replace wooden bridge with concrete

Whitaker Road over Lighter Snag Creek Bridge #525403
Project description: Replace wooden bridge with concrete

Anticipated Start Date 2019:

Hicks Road over West Pittman Creek Bridge #524125
Project description: Replace wooden bridge with concrete

Hicks Road over West Pittman Creek Bridge # 524204
Project description: Replace wooden bridge with concrete and add lanes

Valee Road over Blue Creek Bridge #524107
Project description: Replace wooden bridge with concrete

 

 